|
|
 |
The
lobby area showing the wood doors and stairway. The
architect and builders have done an excellent job maintaining
the finishing touches of the 1931 building.
Feb. 2001
|
 |
The
elevator shaft being bricked on the side of the building.
Feb, 2001
|
 |
An
electrician installing the track lighting in the gallery.
Feb. 2001
|
 |
The
downstairs area just after it was painted. Tile will
soon be put down on the floor.
Feb. 2001
|
|
|
 |
Outside
door to elevator. We're moving items into storage.
Aug. 2001
|
 |
Refinishing
the Hardwood floor in the gallery.
Aug. 2001 |
 |
Storage
Room in new Museum.
Aug. 2001 |
 |
Work
behind the Museum
Aug. 2001 |
| return
to Relocation Page |
|